Boxwood WSSC Water Main Replacement Project

Share & Bookmark, Press Enter to show all options, press Tab go to next option
Print

Project Summary

  • New water mains in portions of Lastner Lane and Ridge Road will be installed offset to the existing water mains, within the paved roadways.
  • New water transmission main serving the standpipe (water tank) will be relocated from existing backyards to the existing public dedication of Ridge Road.
  • Approximately 1,500 feet of new water distribution / transmission mains will be installed.